Precast panel installation for 8000sm Distribution Centre build, Hornby

2024
New Build
Scroll

Our team thought outside the box whilst planning this job, so we could achieve the desired outcome, in a tight space, with a cost effective crane solution. Using the 100T crane, we rotated and installed 122, 10.8m panels over three phases for main contractor, Cohesive Group. 